Tuesday, February 2, 2010

Schematic Design


I am sorry for the very long time before I come back here to keep updating about my progress of my design. The main reason is becauce my laptop was infected by virus and my main source of computer is at the FBE uni lab.

Anyway, based on my discussion with Paulan and Cyrus regarding my schematic design, my main problem was about the 'circulation' of my pavillion. I need to reconsider back everything and start making every single journey become more meaningful. I need to make sure that every space is being used and at the same time, it would benefited the viewers.

Besides, another reminder from Paula and Cyrus is for a 1to50 scale plan, I need to provide as many informations as possible rather than square boxes or just rectangles.