I met John in Week 10 to discuss about my proposal for the community centre.
Based on the discussion with him, some adjustment on the building need to be done especially at the 1st floor. The positioning of the building is also need to be reconsidered since it block the view from the grand stand. Thus, I came out with another proposal during Week 11 presentation.
The result was not good. I still need to reconsider about my design. A lot of changes need to be done before the meeting in Week 12. Based on the comment during the presentation, I need to think about the building in 3D. The main problem was i was not fully utilize the wonderful view of Coggee Beach by covering it with all the stores. Apart from that, I have to rethink about the architecture of the building. Another proposal is still in the making before the meeting in Week 12. Any help?
Subscribe to:
Post Comments (Atom)
No comments:
Post a Comment